Document Library
Project Documents
Documents
-
Economic Impacts of Alternative Buildouts Associated with the Interstate 84/Route 8 Interchange Reconfiguration (October, 2010) (2 MB)
Reference material for information only during the New Mix PEL Study. This report documents a previous CT DECD economic impact analysis for two Mixmaster reconstruction concepts that were developed during an earlier Waterbury Interchange Needs Study (WINS) circa 2010.Uploaded 8/30/2021 -
Analysis, Needs And Deficiencies Report (August, 2020) (44 MB)
This report documents primary existing and future conditions in the New Mix PEL Study Area that contribute to transportation problems (e.g. congestion, safety, substandard roadway geometrics, structural deficiencies) and includes conclusions and summary data from supporting technical analyses. The report also documents certain secondary needs which are typically considered during an environmental review process.Uploaded 8/19/2021
Stay Connected
Join our mailing list to receive project news and updates, including notice of public meetings where you can learn more about the New Mix project.